What Are Stated Objectives?

Requirements: No different than purchasing equipment, make sure the objectives of a project are acquired by collecting and documenting requirements.

"What Do You Want?"
When I was about 8, I sat on Santa's lap and asked for a "Barbie Dream House." I imagined how wonderful that would be. Instead I got a knock-off Barbie Doll. So I used shoe boxes and washcloths for her house. The "house" was easy to build, flexible, economical, environmentally friendly, and most importantly met her (and Ken's!) needs.  Project requirements often describe the Dream House, so it will be important to categorize requirements, as it is unlikely the Dream House will be built to complete satisfaction or will even be needed.

Gathering and Organizing Requirements
There is plenty of debate on the best way to manage and deliver against requirements. The Practical Project Manager focuses on selecting tools and methodologies depending on the size and complexity of the project. 

Check out this concise summary on requirements analysis. 



When gathering requirements, make sure to rate each requirement for its importance and urgency in achieving the stated objective. Create a measurable way to determine what "finished" looks like. 

A simple spreadsheet that states  the category, requirement description, who requested it, what function it satisfies, its priority, urgency, and dependency may be all that is needed. 

For complex, large-scale projects, more sophisticated methods and tools may be required.  Look for tools that tie requirements, product development, testing, defects and changes, and user acceptance. 


Establish a traceability process, so a requirement can be traced through product development, testing, defects and changes, to user acceptance:


Ensure the right people are engaged. The people defining requirements and approving them may be two different teams.

Ensure requirements and decisions tie to overall project objectives, funding, and timeline.

Prioritize requirements: A) must have B) meets objectives C) rounds out delivery

Determine urgency: 1) must do now 2) can wait

Requirements have a priority/urgency rating: e.g. "A1" is a must have/urgent rating.




Always refer to your company's methodology or the Project Management Institute for specific how-to.

How To Actually Get Work Done, Action Items

What Is An Action Item?
A generally accepted definition is this:  "An action item is a documented activity, event, or task. Action items are discrete entities that can be dealt with by a single person."   While this is true, the Practical Project Manager knows action items are an important part of actually getting work done.  Successful projects have solid practices and controls around definining, managing and actually completing work associated with action items.


Action items are:  
  • Unplanned work associated with issue and risk management
  • Often discovered during a meeting or formal discussion regarding an issue or risk
  • Prioritized, assigned, managed for completion
Action items can sometimes be confused with unplanned work, that is, work that should have been documented as a task in the Project Schedule.  If there is significant unplanned work, the project may require a Scope Change.  

It is important to monitor action items to make sure there is not "Scope Creep".  Sometimes action items take on a life of their own, resulting in a significant work effort just to manage actions.  This can be an indicator that scope was not sufficiently managed or that additional scope is creeping into the project under the guise of action items.

How to Manage Action Items
The best way to manage action items is to record them in an ACTION ITEM LOG using a collaborative tool such as SharePoint or Google Apps.

Build a collaborative ACTION ITEM LOG that has the following features and includes email alerts to the responsible person, attachments, and a historical archive:
  • Description - Short explanation of activity to be performed
  • Work Stream - your project is probably organized into various work streams such as business requirements, technical design, user interface, etc. 
  • Issue or Risk - is this action item associated with a project issue or risk
  • Status - Open, In Progress, Resolved, Canceled, Transfered to Training Log
  • Urgency - how quickly does this action need to be performed?  1) must do now 2) can wait 
  • Priority - what is the impact to your project's critical path? 1) High 2) Medium 3) Low
  • Comments - A description of what is now being done to solve the issue
  • Responsibility - Who is responsible for actively working the issue?
  • Created Date - Date issue was opened
  • Next Step - What is the next activity for working the issue?
  • Next Step Due Date - When is this person's next action due?
  • Planned Completion Date - When will this issue be solved?
  • Actual Completion Date - Date issue was closed
The Practical Project Manager maintains the ACTION ITEM LOG and builds an interactive tool so actions can be maintained by those responsible for resolution.  Managing the team's work against completing the action items is the project manager's responsibility. 
Always refer to your company's methodology or the Project Management Institute for specific how-to.

How To Actually Get Work Done, Introduction

The Heartbeat of a Project is in Actually Getting Work Done


Actually "getting work done" can be extremely difficult if a project is bogged down by politics, bureaucracy, poor planning, a shortage of resources, or other external factors.


The Practical Project Manager actually gets work done by ensuring execution of day-to-day work activities, both Planned and Unplanned Work, with clear communication, deliberation, and enthusiasm.
  • Planned Work is documented in a Project Schedule (for example using Microsoft Project).  When work is planned, it is then "baselined", and provides the initial Estimate At Completion (EAC).  
  • Unplanned Work comes in two forms:

  1. action items associated with issue and risk management
  2. tasks that probably should be in the Project Schedule, that is, work that is required, but not previously planned.  

If Unplanned Work is significant, it may require a Plan Change, which would require an Updated Baseline and will provide a new Estimate at Completion (EAC).





Planned Tasks:  Project Scope is broken down into discrete work streams and work elements using a work breakdown structure (WBS) method.  These planned tasks include no more and no less than the work effort required to meet Project Scope.
Project Schedule:  a collection of tasks that include resources, start and end dates, dependencies, level of effort, and percentage of work completed for each activity.  There are many methodologies and software packages to create and maintain the schedule.  Typically the graphical representation of the schedule is a GANTT CHART.
Plan Baseline: once a project schedule is completed and approved it is said to be "baselined":  an agreed-upon plan for completing work.  With this original plan, performance of actual work can be compared to baseline as data points for  Earned Value Management and to provide better estimates for future projects.
Estimate at Completion (EAC):  If you plan the work, work the plan, and maintain status of work completed in the project schedule, you will always know total project cost and timeline.  EAC is a critical project metric and is determined by adding the actual cost of work performed (ACWP) plus the estimate to complete (ETC) for remaining work. 
Unplanned Tasks:  some work cannot be foreseen, however the Practical Project Manager knows work will arise from Action Items and Additional Tasks and provides enough "head room" in the plan for this inevitable work.
Plan Change:  the plan may need to change if work required is greater than expected, if there is a resource constraint, or there is an external force that causes and impact to the project.  A governance process should be in place to control changes to the plan.
Updated Baseline: upon approval of plan changes, the project schedule is updated and re-baselined.  

Updated Estimate at Completion (EAC): The new EAC is communicated and work commences against this new plan.






Always refer to your company's methodology or the Project Management Institute for specific how-to.



Risk and Issue Management

Managing Project Risks and Issues
I was on a project once where the sponsor said "we don't have any risks, but we have a lot of issues".   Hmmmm.....before those issues became issues, there must have been a RISK that they could occur.


The Practical Project Manager establishes tools, communication, and responsibilities for managing risks and issues.  Start by determining if the company has a project risk and issue management process in place.  If so, follow that process and be sure the following features are in place at the project level.




All projects automatically come with several risks and issues even before they start!

You may want to consider the major areas a project covers.  For example its requirements, timeline, budget all have inherent risks.  How this project interacts with other areas and initiatives, your resources and team, quality assurance, how teams and people communicate with one another, and how you are going to acquire resources to get the work done all come with inherent risks.  Even managing risks and issues has its risk!

If you follow the PMBOK® Knowledge Areas, you may want to consider aligning your risks and issues with their knowledge areas.  Please note: PMBOK® is a registered trademark of the Project Management Institute and is referenced here in the spirit of education and open content.
  • Integration
  • Scope
  • Time
  • Cost
  • Quality
  • Human Resources
  • Communication
  • Risks and Issues
  • Procurement

Risks
What is a Risk? "Could my project fail?"
Something that will impact overall success of the project.

Risks need to be weighted for their impact and probability, managed at the steering committee level, and have a clear escalation plan for resolution.

Each risk is documented as follows.  A simple spreadsheet is all that is needed to document risks.  List each risk in the left margin, add the following column headings, and sort the log by SCORE as described below.  Work on the largest risks first.

  • Description - a risk area may have more than one risk, for example there may be three integration risks
  • Probability - the chance this risk will actually occur (on a scale of 1-5, where 1 is not likely, and 5 is imminent)
  • Impact - the effect on your project (on a scale of 1-5, where 1 is very low, and 5 is catastrophic)
  • Score - determines the size of the risk and which risks require the most attention.  Multiply Probability X Impact.  An imminent, catastrophic risk has a score of 25.
  • Mitigation Plan - A description of what is now being done to avoid this risk from impacting your project
  • Contingency Plan - A description of what will be done if this risk actually causes an issue or potential project failure
  • Responsibility - Who is responsible for actively working the mitigation of this risk?
  • Next Step - What is the next activity for mitigating this risk?
  • Next Step Due Date - When is this person's next mitigation action due?

The Practical Project Manager maintains the PROJECT RISK LOG, reviews it with the Project Steering Team at least monthly, and gets status updates on next steps from responsible team members on a weekly basis.

Issues
What is an Issue?  "Do I need a course correction?"

Something that could slip a critical path in the project, but not yet likely to impact its overall success.
 
Issues are managed by the project manager at the team level and are prioritized with accountability and due dates.
 
All projects have issues, the larger the project, the larger the issues.  Issues tend to take on a life-form of their own, so keep a historical record of activity associated with an issue, especially decisions made along the way to resolve the issue.  As a reminder an issue is only an issue if it could slip a critical path in the project.  A difficult action or work activity is not necessarily an issue.
 
If you have access to a tool such as SharePoint or Google Apps, build collaborative ISSUE LOG that has the following features and includes email alerts to the responsible person, attachments, and a historical archive:

  • Description - a issue area may have more than one issue, for example there may be three quality issues
  • Work Stream - your project is probably organized into various work streams such as business requirements, technical design, user interface, etc. 
  • Status - Open, In Progress, Resolved, Canceled, Transfered to Training Log
  • Urgency - how quickly does this issue need to be resolved?  1) must do now 2) can wait 
  • Priority - what is the impact to your project's critical path? 1) High 2) Medium 3) Low
  • Resolution Plan - A description of what is now being done to solve the issue
  • Responsibility - Who is responsible for actively working the issue?
  • Created Date - Date issue was opened
  • Next Step - What is the next activity for working the issue?
  • Next Step Due Date - When is this person's next action due?
  • Expected Resolution Date - When will this issue be solved?
  • Resolution - A description of what was done to actually resolve the issue once it is closed
  • Resolution Date - Date issue was closed

The Practical Project Manager maintains the ISSUE LOG and builds an interactive tool so issue status can be maintained by those responsible for resolution.  However creation and setting the urgency and priority of an issue is the project manager's responsibility. 

Summarize issues with the Project Steering Team at least monthly and review issues with team leads on a weekly basis.  Build a summary report that includes the following:

  • Number of issues by work stream, urgency, and priority
  • Number of issues by person responsible
  • Average number of days to close an issue
  • Trend or graph issue management over time.  This is an excellent metric to tell a story such as "We had 25 issues last month with an average days open of 10.  However this month we have 35 issues and our average days open has increased to 15."

Remember that an Action is not an Issue or Risk, but rather a task that needs to be worked. Actions have resources, due dates, durations, and dependencies.


Always refer to your company's methodology or the Project Management Institute for specific how-to.


The Three-Legged Stool

Time, Cost, Quality: The Project Manager's Three-Legged Stool 

There are many analogies for "the three-legged stool", ours is all about balancing the budget with the timeline and the quality (which is usually measured by scope and thoroughness of products or services provided by the project).





"Absolutely Nothing Works!"

Yep, that was the primary complaint by one of my business owner on a large scale ERP project.  Hmmm.  Do we need to get more money to make sure we fix everything?  Do we need to push out our deadline?  Is our test plan so bad that we let a lousy solution move forward?  The impulse is to increase quality/scope, ask for more money, ask to extend the deadline to satisfy the business owner's complaint.    


The Practical Project Manager balances the three-legged stool by making course corrections.  This is done by maintaining great relationships and keeping communication flowing to ensure the best quality product or service is being produced.  Here is how:


Review your EXTERNAL FORCES CHECKLIST.   
  • What resources (time/cost/quality) are MOST available?  
  • Is your timeline more negotiable than your budget?  
  • Do you have a resource constraint or are there available resources who can help out?
  • Does your solution fit in with appropriate innovation or technology trends?  Is it off-point?
  • Does your solution meet the stated objectives, realizing there may be some kinks to work out?
  • Review which requirements are working / not working and how important they are to meeting your stated objective
Knowing what resources you can leverage is key, but first a little reality check on how things really work:

Constraints are set by external forces, specifically timeline and budget.  External forces also determine the value your project brings to the overall enterprise.  However, this may not be as apparent or important as the forces on  your timeline and budget.  Your Subject Matter Experts (or SMEs, pronounced "smeez") provide detailed requirements which guide your quality and scope.  


Here is the reality:  you will have a downward force to reduce the timeline and or budget, but will have upward force to increase the quality of your product or service to meet the stated objectives.  So most of your time will be spent ensuring the best quality work product is being produced within these constraints.

  • Talk to people one on one.  How are things actually going?  Are there actions, issues, risks that require attention or course correction?
  • Plan the work, work the plan.  Are you executing against plan?
  • What is your ETC (Estimate To Complete)?  Do you know at all times what percent of work is complete and what percent is remaining to meet stated objectives?
  • Conduct a DAILY STAND UP with your team (or request your team leads do this with their respective teams)
  • Conduct a PROJECT REVIEW with team leads every week
  • Update your plan and calculate your ETC (ESTIMATE TO COMPLETE) once a week
  • Report written status to the PROJECT SPONSOR at least every two weeks
  • When writing status reports, make sure to get feedback and approval for course correction; your status includes where you are at COMPARED TO WHERE YOU PLANNED TO BE AT.
  • Document COURSE CORRECTION decisions
  • BALANCE THE BUDGET once a month




Always refer to your company's methodology or the Project Management Institute for specific how-to.

Announcing my new blog on Solution Leadership, "The Solutionist"

Follow me at http://solutionleadership.blogspot.com/  If you are an aspiring solution architect or IT manager, take a look at this digest on how to design and lead solutions. 


As many of you know I am organizing and posting my professional notes in three topics.  Two down, one to go!

The Practical Project Manager
New!  The Solutionist
Coming Soon!  The 360.CIO

Enjoy!  Your feedback is appreciated.

Earning Trust

Reliability + Integrity = Trust
A former client of mine remembers me as "the person who actually got something done."  As small a compliment as that was, I knew I had earned that person's trust.  There are two components to earning trust:  1) you actually have to get good quality work finished and 2)  you must do it with integrity.  



The Practical Project Manager gets the job done and leads the project with fairness, truthfulness, and respectfulness.


Start With The Basics
Paraphrasing Robert Fulghum, author of "All I Really Need to Know I Learned in Kindergarten" , several basic points are key

  • Share everything
  • Play fair
  • Clean up your own mess
  • Don't take things that aren't yours
  • Say you're sorry when you hurt somebody
  • Balance your work/home/play life
Reliability 
If you are good at what you do and actually get work done, you will begin to earn trust.

  • Set realistic goals for you and your team
  • Plan your work, work your plan
  • Do what you said you would do or course correct
  • Communicate results (both good and bad)
  • Be a better time manager
Integrity 
It's not enough to be a good project manager and get work done.  You must also do it with integrity.

  • Validate and respect others' points of view
  • Meet, greet, and seek out people you are depending on and people depending on you
  • Your tone sets the tone for the project.  There is no reason to be mean or angry even in the most difficult situations.  Face difficulties with professionalism and dignity.
  • Build relationships and friendships, but be careful with "mixing business with pleasure"
  • Speak less, listen more:  assume the speaker is right when listening; you will learn more and actually hear what they are saying
  • Follow the Golden Rule:  Do unto others as you would have them do unto you
People, People, People
Much of your work as a project manager is to make sure other people are doing their work!  Projects are people, people developing new products and services, and people executing business processes.  Communicating with people is the most important part of your job.

Start Your Day This Way
Do you spend 90% of your time communicating with people?
Are you creating value?
Are you fostering spirit, teamwork, and a zeal for delighting the stakeholders?


Refer to: #1 Earn the Trust of Others

Always refer to your company's methodology or the Project Management Institute for specific how-to.

Start by Imagining Project Success

"What's The Point?"
I worked on a project where "what's the point" was actually the (cynical) tag line!  Team members, sponsors, and stakeholders all ran around asking the question "What's The Point?"  


The Practical Project Manager knows the impact of external forces on a project's timeline and chance for successful completion.  This goes beyond project communication: we must delve into our surroundings and understand the environment we are working in.  


A successful project delivers against stated objectives and provides clear value to the enterprise.







External Forces
External forces are also moving and changing and are as important as internal project activity

  • What else is your team working on?
  • What is the resource allocation process to ensure your resources are adequately available?
  • What does the overall portfolio look like and how does your project fit into the priority scheme?
  • How are you able to communicate project status externally?
  • Have you read the company's Annual Plan and Quarterly Reports?  
  • What is happening with the company overall, with the industry it operates in and is impacted by, with the economy?
  • What are the innovation and technology trends?  How is your project enabled or constrained by these trends?
Create an EXTERNAL FORCES CHECKLIST.  From this checklist, ask questions!  You will discover and be able to manage RISKS, DEPENDENCIES, and INTEGRATION POINTS that impact your project.


Project Duration
The longer the project duration, the more likely you will need to monitor activities outside your scope and make adjustments accordingly


A project with a short duration, let's say 3-6 months is less likely to be impacted by or impact external activities.  If a project is planned to last longer than 6 months, several complexities enter the picture:
  • Does your project need to be broken down into smaller deliverables?  Is this really a program (a collection of projects)?
  • What have you assumed to be constant or changing over the life of the project?  
  • What if these assumptions are no longer valid over time?
  • Look at the timeline of competing, dependent, and complementary projects.  How do they impact your timeline?
  • Are there external mandates (such as legal requirements) that force your project to a fixed timeline?
  • Will your project need to provide intermediate results given the changing landscape?
  • Have your requirements changed over time due to new innovation, technology, or changing business needs?
Before building a complex GANTT chart, create a high level DEPENDENCY CHART which shows the timeline of external forces relative to your project.  These forces may dictate a specific timeline.


Finishing a project
A project is over when it is finished, canceled, you run out of time or money, or it has failed.  A project is rarely over when it is ‘finished’, so always work on the core, critical items first


Most will say a project is over when it is finished to the project sponsor's satisfaction.  The reality is a project is over when one of the following is achieved:


Finished - in the zeal to finish a project, we often strive to complete every requirement approved by the project sponsor.  However, a successful project is measured on how well it meets the stated objective.  When gathering requirements, make sure to rate each requirement for it importance and urgency in achieving the stated objective.  Create a measurable way to determine what "finished" looks like.


Canceled - projects are often canceled due to funding cutbacks, lack of resources, or lack of project sponsorship. If your project is canceled, make sure to leave clear project close-out documentation since canceled projects may be restarted at a later date.


Out of Time - if a timeline mandate is in place, for example a tax law changes at the end of the year, the project is finished at that moment.  Again, make sure the most important and urgent requirements are completed first.


Out of Money - most often, projects are finished when they are out of money.  Typically a project is awarded a certain budget based on a mandate, return on investment, or the financial tolerance for that business unit.  When the money runs out, the project is finished.  I cannot stress the importances of ensuring important and urgent requirements are completed first.


Failed - Sadly, many projects do not meet the stated objectives and ultimately fail.  Some studies suggest 60-75% of technology projects fail!  Even projects that meet stated objectives fail because the objectives do not create value to the enterprise.  I believe most projects fail because they fall short of expectations SET BY EXTERNAL FORCES, that is, the stated objectives of a project do no create clear value to the enterprise.


In Summary
The Practical Project Manager:
  • monitors EXTERNAL FORCES to identify RISKS, DEPENDENCIES, and INTEGRATION POINTS
  • builds a high level DEPENDENCY CHART which shows the timeline of external forces
  • ensures important and urgent requirements are completed first
  • delivers Project Success by delivering an improved product or service that has clear value to the enterprise.
Refer to: #5 Don’t Work in a Vacuum
Always refer to your company's methodology or the Project Management Institute for specific how-to.






Welcome!

Welcome to "The Practical Project Manager"
Everything you need to run a successful project!

If you are an aspiring project manager, especially in the technology area, this is a digest of information accumulated over the last 30 years or so...a concise, direct, and practical approach to project management.

Before getting started, you may want just a bit of background on what project management is all about. Take a peek at the
wikipedia definitions before moving forward. Additionally, you may want to review the wealth of information provided by the Project Management Institute, specifically the "Project Management Body of Knowledge (PMBOK®)" guide.  Please note: PMBOK® is a registered trademark of the Project Management Institute and is referenced here in the spirit of education and open content.

Make sure to sign up as a "follower" and subscribe to this blog for on-going updates.

Introduction

What does The Practical Project Manager focus on every day? 
Tips that stand the test of time.  Focus on these five areas every day...now that's practical!

#1 Earn the Trust of Others
Relationships, spirit, people, communication, and creating value

#2 Balance the Three-Legged Stool
Time, cost, quality - the delicate balance

#3 Know the Difference
Risks, Issues, Actions

#4 Get the Right Stuff
Requirements & Decisions, Equipment and staffing acquisition, Procurement

#5 Don’t Work in a Vacuum
Integration, dependencies, scope and when to stop

    #1 Earn the Trust of Others

    1.  Relationships and communication are key
    2.  Mean project managers breed mean projects
    3.  No matter what stated objectives are, remember to deal with people … and people are not machines
    4.  Manage the project, not the project plan
    That means spending communicating 90% of time with people who are involved (or should be involved) and 10% on ‘paperwork’
    • Are you creating value?
    • Are you fostering spirit, teamwork, and a zeal for delighting the stakeholders?

    #2 Balance the Three-Legged Stool

    1.  The three legs are time, cost, and quality/scope
    2.  They are never quite evenly balanced
    3.  The project manager is usually dealt too little time and too little budget
    4.  Try balancing by ensuring the best quality work product is being produced
    5.  The best way to balance is to maintain great relationships and keeping communications flowing
    • Are you checking project balance every day?
    • What is your process for course correction?

    #3 Know the Difference

    What is a Risk?  "Could my project fail?"
    Something that will impact overall success of the project.
    • Risks need to be weighted for their impact and probability, managed at the steering committee level, and have a clear escalation plan for resolution.
    What is an Issue?  "Do I need a course correction?"
    Something that could slip a critical path in the project, but not yet likely to impact its overall success.
    • Issues are managed by the project manager at the team level and are prioritized with accountability and due dates.
    What is an Action?  "Are actions prioritized and assigned?"
    Tasks that need to be worked. Actions have resources, due dates, durations, and dependencies.
    • Resources assigned are accountable for them. The project manager keeps on-going tabs on their completion.

    #4 Get the Right Stuff

    Requirements and Decisions

    • No different than purchasing equipment, make sure the objectives, requirements and decisions are acquired. 
    • Ensure the right people are engaged. The people defining requirements and approving them may be two different teams. 
    • Ensure requirements and decisions tie to overall project objectives, funding, and timeline 
    • Prioritize requirements: A) must have B) meets objectives C) rounds out delivery
    • Determine urgency: 1) must do now 2) can wait
    • Requirements and decisions have a priority/urgency rating: e.g. "A1" is a must have/urgent rating.
    Equipment and staffing acquisition

    • Get the best money can buy 
    • Don’t assume people and equipment will work into the job 
    • You don’t have time to deal with incompetence or substandard equipment 
    • One very talented person can usually do three times the work a less competent or inexperienced person can. So it’s ok to pay double for that resource! 
    Procurement

    • Don’t just throw this job over to the purchasing department 
    • The procurement process takes 2-3 times longer than you’ve planned for and has an enormous number of dependencies 
    • Always triple the planned duration for the procurement process and start it as soon as possible

      #5 Don’t Work in a Vacuum

      Integration, dependencies, scope and when to stop
      • External forces are also moving and changing and are as important as internal project activity
      • The longer the project duration, the more likely you will need to monitor activities outside your scope and make adjustments accordingly
      • A project is over when it is finished, canceled, you run out of time or money, or it has failed
      • A project is rarely over when it is ‘finished’. So always work on the core, critical items first

      A Simple Plan

      How to run a great project

      Implementation = Stated Objectives
      Your job is to determine how best to implement deliverables to meet stated objectives:

      • If technology or objectives are not yet known, then ensure definition, funding, and alignment with key stakeholders 
      • Perform the full life-cycle execution work 
      • Along the way, coach and train employees in preparation for project closure and transition to production support 

      Recipe for Success

      • INITIATE by defining objectives, funding, and stakeholder alignment 
      • Agree on how to CONTROL the project  
      • EXECUTE against the plan and allow for course corrections 
      • DELIVER and delight the client!



        Initiate
        • Establish the methodology to be used
        • Memorize the Guide to the Project Management Body of Knowledge (PMBOK®)" guide. Please note: PMBOK® is a registered trademark of the Project Management Institute and is referenced here in the spirit of education and open content.
        • Integrate with company’s methodology
        • Define roles & responsibilities
        • Define the communication plan
        Control
        • Assess project health and constraints
        • Are desired timeline, cost/resource plan, and quality/scope in balance?
        • Ask this question daily and course correct
        • Review with project leads weekly
        • Escalate to senior management at least monthly
        Execute
        • Establish key work streams and control points
        • Establish Integration points
        • Create processes for:
        1. on-going scope control
        2. plan and budget updates
        3. decision models
        4. issues/risk management
        5. test and quality management
        6. team staffing
        7. procurement
        8. hand off points
        9. standards
        Deliver
        • Prepare for production release
        • What are the go-live criteria?
        • Who is responsible for measurement and approval?
        • Plan for:
        1. post production stabilization
        2. project closure
        3. transition to long-term maintenance
        4. Conduct lessons learned
        Project Lines to Live By
        • Communication is 95% of the picture
        • Lead with a carrot, not a stick
        • Lead by example
        • Sit on the three-legged stool every day (are time, cost, and quality in balance?)
        • Manage by walking around
        • Start and end the day with this question: Are we doing the right thing?
        • You always miss 100% of the shots you don’t take
        • Have fun, make fun


        Managing Change

        What is Change Management?
        Change Management is the practice of ensuring business discipline, communication, and training / education are initiated, executed, and delivered as part of a project.


        The Practical Project Manager ensures changes that will impact the organization are managed. These are the changes during the life of the project as well as the long-term organizational changes once the product is delivered.  Projects often fail due to lack of focus on change management. Depending on the project, change management may represent 30-50% of the overall project budget.


        A point of clarification: this article about the change a project will bring to an organization. Not "change control" or "ITSM Change Management" , meaning controlling the technical changes to a computer system.



        Business Discipline
        Buy-in at all levels and phases

        • Executive Sponsorship
        • Steering Team
        • Resource Managers
        • Project Team Spirit: "we are doing the right thing"
        • Engagement, awareness and sensitivity for stakeholders and people impacted by change


        1. During project initiation, identify who will be responsible for change management and the groups of people responsible for business discipline.
        2. During project execution, engage groups at appropriate intervals using appropriate methods depending on roles.
        3. Upon delivery and at project closure, ensure the long-term plan is in place for on-going governance.

        Communication
        Project Status and Product Adoption

        • Daily, weekly, and periodic project status
        • Generating excitement
        • Project team environment, physical space, tools
        • Working face-to-face, working virtually
        • Handling bad news
        • "Going Live"
        • Project closure
        • Post-production support

        Training and Education
        New People, Process, Technology


        Often projects focus on product/technology development, for example a new website. In order for the new product to be effective, processes need to be developed and people need to be trained.

        • Project team on-boarding and training
        • Business process management ("BPM")
        • Training plan, logistics, materials, coordination, delivery
        • Production operations (in-house, outsource, administration)
        • Impacts on individuals, job functions, results objectives
        • Measurements of expected vs. actual change, change readiness, long term adoption
        See the Change Management Life Cycle Blog for more information on how to actually execute the change.